What is the problem?
项目前风险评估表填完后,要检查目标、材料、权限、验收、报价边界和暂停条件是否清楚,避免把未知风险写成已确认范围。
Quick solution
Treat this as a AI tools checklist issue. First confirm the environment, inputs, permissions, logs, and delivery boundary. Then use the linked deep guide for the full checklist before changing production code or promising a result.
Read the deep guideDetailed steps
- 客户目标是否能用一句话复述。
- 是否有截图、链接、仓库、日志或设计稿等证据。
- 缺失材料是否明确列出。
- 是否知道谁提供权限、什么时候提供。
- 是否区分诊断、修复、部署、维护。
- 验收标准是否可以截图、命令或链接证明。
Commands or code
风险评估复核
目标清楚:是 / 否
材料完整:是 / 否
权限明确:是 / 否
验收明确:是 / 否
风险已列出:是 / 否
暂停条件:有 / 无
最小交付范围:
客户确认问题:
是否适合报价:Risk notes
Confirm the real project environment, account permissions, platform rules, and output quality before delivery. Do not ship AI-generated changes without human review, and do not claim indexing, income, deployment success, or ranking improvements without measured evidence.