What is the problem?
项目交付前,新手要检查需求、改动、截图、命令、测试、文件范围、未完成事项和客户验收方式。交付不是说 done,而是给出可复查证据。
Quick solution
Treat this as a AI tools tutorial issue. First confirm the environment, inputs, permissions, logs, and delivery boundary. Then use the linked deep guide for the full checklist before changing production code or promising a result.
Read the deep guideDetailed steps
- 原始需求摘要。
- 本次完成范围。
- 改动文件或交付物。
- 验证命令和结果。
- 前后截图或预览链接。
- 未完成或未验证事项。
Commands or code
本次交付内容:
- 完成:
- 修改文件:
- 验证方式:
- 预览链接或截图:
需要你确认:
-
未包含范围:
-Risk notes
Confirm the real project environment, account permissions, platform rules, and output quality before delivery. Do not ship AI-generated changes without human review, and do not claim indexing, income, deployment success, or ranking improvements without measured evidence.