What is the problem?
AI 新手判断能不能接项目时,常见错误包括只看预算、相信 simple、跳过材料检查、不会写边界和把学习任务当成交付任务。
Quick solution
Treat this as a AI tools troubleshooting issue. First confirm the environment, inputs, permissions, logs, and delivery boundary. Then use the linked deep guide for the full checklist before changing production code or promising a result.
Read the deep guideDetailed steps
- 先写出客户真正要解决的问题。
- 再列出你已经拿到的材料。
- 标记项目里的低风险、中风险和高风险信号。
- 写出你准备如何验证结果。
- 写清本次交付包含什么、不包含什么。
- 这个项目影响线上业务吗?
Commands or code
先问三个问题:
1. 这个项目影响线上业务吗?
2. 我能在测试环境验证结果吗?
3. 出问题时有没有回退方式?Risk notes
Confirm the real project environment, account permissions, platform rules, and output quality before delivery. Do not ship AI-generated changes without human review, and do not claim indexing, income, deployment success, or ranking improvements without measured evidence.